Regarding the land required for the construction of viaduct in the Mumbai Metro Phase-6 (Swami Sathargarh-Jogeshwari-Vikhroli) project (Mauje Bandivali, Distt. Andheri, No.B.No.196 Area 248.30 sq.m.)
Title | Description | Start Date | End Date | File |
---|---|---|---|---|
Regarding the land required for the construction of viaduct in the Mumbai Metro Phase-6 (Swami Sathargarh-Jogeshwari-Vikhroli) project (Mauje Bandivali, Distt. Andheri, No.B.No.196 Area 248.30 sq.m.) | Regarding the land required for the construction of viaduct in the Mumbai Metro Phase-6 (Swami Sathargarh-Jogeshwari-Vikhroli) project (Mauje Bandivali, Dist. Andheri, No.B.No.196 Area 248.30 sq.m.) |
19/01/2024 | 19/02/2024 | View (664 KB) |